It’s been a little over a year since Ampere started to deliver their first generation Altra processors. The “Quicksilver” design with 80 Neoverse N1 cores was the first merchant Arm silicon on the market who really went “all-out” in terms of performance targets, aiming for the best of what AMD and Intel had to offer, ending up in a very competitive standing against the newest EPYC CPUs and leapfrogging Intel’s offerings.

Since that first review, the competition has released two new generation platforms, the newer EPYC Milan chips, showcasing a good generational boost, and Intel dramatically narrowing the performance gap with the new Ice Lake-SP Xeon parts.

Related Reading:

For the Arm ecosystem and Ampere in particular, things naturally also aren’t standing still; following the first-gen 80-core Quicksilver design, we had long expected the 128-core “Mystique” Altra Max design. Arguably a bit late compared to Ampere’s initial Q4 2020 projections, we’ve now finally had our hands on the new many-core monster for today’s initial review.

Pushing it to 128 Cores

The new Altra Max is a quite exciting part, but it’s also relatively straightforward design compared to the original Altra parts. While the original chip had been pushing 80 Neoverse-N1 cores, the new Altra Max is pushing 128 cores. While there are also slightly improved technical differences between the two chip generations, that is mostly the main large differentiation between the two designs.

Ampere is still continuing to offer both Altra and Altra Max chips in their product line-up, with the Max parts in particular filling the high-core count SKU segment:

Ampere Altra SKU List
AnandTech Cores Frequency TDP PCIe DDR4 Price
Altra Max "Mystique"
M128-30
(Tested)
128 3.0 GHz 250 W 128x G4 8 x 3200 $5800
M128-28 128 2.8 GHz 230 W 128x G4 8 x 3200 $5500
M128-26 128 2.6 GHz 190 W 128x G4 8 x 3200 $5400
M112-30 112 3.0 GHz 240 W 128x G4 8 x 3200 $5100
M96-30 96 3.0 GHz 220 W 128x G4 8 x 3200 $4550
M96-28 96 2.8 GHz 190 W 128x G4 8 x 3200 $4250
Altra "Quicksilver"
Q80-33
(Tested)
80 3.3 GHz 250 W 128x G4 8 x 3200 $4050
Q80-30 80 3.0 GHz 210 W 128x G4 8 x 3200 $3950
Q80-26 80 2.6 GHz 175 W 128x G4 8 x 3200 $3810
Q72-30 72 3.0 GHz 195 W 128x G4 8 x 3200 $3590
Q64-33 64 3.3 GHz 220 W 128x G4 8 x 3200 $3810
Q64-30 64 3.0 GHz 180 W 128x G4 8 x 3200 $3480
Q64-26 64 2.6 GHz 125 W 128x G4 8 x 3200 $3260
Q64-24 64 2.4 GHz 95 W 128x G4 8 x 3200 $3090
Q32-17 32 1.7 GHz 45 W 128x G4 8 x 3200 $800

The unit we’re testing today, the flagship Altra Max M128-30, with 128 cores and a 3.0GHz clock (again, noteworthy congratulations of Ampere’s straightforward and descriptive part naming), with a maximum TDP of 250W.

Much like the first-generation parts, platform side features are all identical throughout the product stack, always featuring the maximum 128 lanes of PCIe 4.0 and 8-channel DDR4-3200 capabilities.

Comparing the M128-30 to the Q80-33, the new Altra Max part is able to fit in 60% more cores, albeit at 10% lower frequency, within the same advertised TDP. It’s to be noted that TDP here doesn’t mean power consumption, and in our initial review of the Q80-33 we noted that the chip in many workloads hovered at power levels much below the TDP, possibly explaining why and Ampere was able to grow the core count this much even though the chip isn’t on a fundamentally different process node (TSMC N7), though it’s on a better implementation.

The SKU list for the new Altra Max parts is interesting in that there’s only parts from 96 cores onwards, with anything below that still being serviced by the original Altra SKUs. It’s very likely that due to the process node maturity of the N7 node that Ampere here likely has few chips yielding with fewer cores, and the higher clocks and larger cache of the Quicksilver chips would be better served for lower core count deployments anyhow.

In terms of pricing, Ampere is quite aggressive, vastly undercutting both AMD and Intel’s flagship parts MSRPs, though as always, what large customers and hyperscalers pay are most of the time never in line with those prices anyhow – but it’s still a large win for Ampere in terms of visible pricing.

The Altra Max is extremely straightforward in terms of deployment: following some initial required firmware updates, it’s essentially a drop-in solution on the existing Altra platforms, which is exactly what we did for our review, re-using the original Mount Jade reference server from Wiwynn. The only practical note to make here is that at time of writing, Ampere currently doesn’t have a dual capable firmware stack that would enable swapping around from Altra to Altra Max and vice-versa, our initial setup was a one-way upgrade, with interoperability firmware still being something in the works for the future.

Test Bed and Setup - Compiler Options
Comments Locked

60 Comments

View All Comments

  • dullard - Thursday, October 7, 2021 - link

    Far too many people mistakenly think it is AMD vs Intel. In reality it is ARM vs (AMD + Intel together).
  • TheinsanegamerN - Thursday, October 7, 2021 - link

    In reality it's AMD VS INTEL, with ARM the red headed stepchild with 3 extra chromosomes drooling in the corner. x86 still commands 99% of the server market.
  • DougMcC - Thursday, October 7, 2021 - link

    And the reason is price/performance. These chips are pricey for what they deliver, and it shows in amazon instance costs. We looked at moving to graviton 2 instances in aws and even with the in-house pricing advantage there we would be losing 55+% performance for <25% price advantage.
  • eastcoast_pete - Thursday, October 7, 2021 - link

    Was/is it really that bad? Wow! I thought AWS is making a value play for their gravitons, your example suggests that isn't working so great.
  • mode_13h - Thursday, October 7, 2021 - link

    Could be that demand is simply outstripping their supply. Amazon isn't immune from chip shortages either, you know?
  • DougMcC - Thursday, October 7, 2021 - link

    It was for us. Could be that there are workload issues specific to us, though as a pretty basic j2ee app it's somewhat hard for me to imagine that we are unique.
  • lightningz71 - Friday, October 8, 2021 - link

    It is VERY workload dependent.
  • lemurbutton - Friday, October 8, 2021 - link

    Graviton2 is now 50% of all new instances at AWS.
  • DougMcC - Friday, October 8, 2021 - link

    Not super surprising. Even with the massive loss of performance, it's still cheaper. If you don't need performance, why wouldn't you choose the cheapest thing?
  • Wilco1 - Friday, October 8, 2021 - link

    In most cases Graviton is not only cheaper but also significantly faster. It's easy to find various examples:

    https://docs.keydb.dev/blog/2020/03/02/blog-post/
    https://about.gitlab.com/blog/2021/08/05/achieving...
    https://yegorshytikov.medium.com/aws-graviton-2-ar...
    https://www.instana.com/blog/best-practices-for-an...

Log in

Don't have an account? Sign up now